Starter Vape Kit fitment with trackable ship
This page is for distributors who want a working answer on specification, price and lead time before they commit a purchase order. We have written the detail down so nobody has to sit through a sales call to extract it.
Published 28 February 2025 · VapeWholesaleHub · Reading time 5 min
How orders move from factory to shelf
We ship starter vape kits to distributors, chain buyers and independent shops. What follows is the material we normally cover in a first conversation: what we hold in stock, how we test it, how it ships, and what happens when a carton arrives damaged.
If you dropship, we can label cartons to your format and omit our documentation from the outer box. It is a small operational detail that decides whether your customer sees a supplier or a partner.
Transit times move with the season. Book space early for Q4 and around Chinese New Year, when factory output pauses for two to three weeks and freight rates tighten at the same time.
Merchandising a small range well
Counter space is finite. Three well-chosen SKUs outsell nine crowded ones, and the empty space signals a curated range rather than a clearance table.
Staff knowledge converts better than any poster. If your team can explain the difference between two coils in one sentence, the step-up SKU sells itself.
Price breaks and payment terms
The cheapest way to lower your cost per unit is usually to remove a SKU, not to negotiate a discount. Fewer lines means larger runs, fewer changeovers and a better price at the same quality.
Currency moves more than most buyers expect over a twelve month supply plan. We quote in USD and hold the price for 30 days from confirmation so your margin calculation is not guesswork.
- Standing reorder schedule with a fixed cut-off
- Artwork proof plus physical dummy for custom packaging
- Seven-day defect reporting with replace-or-credit
- Private label files archived for future rebrands
- Mixed SKU cartons to spread first-order risk
- Reference sample retained from every batch
Batch consistency and why it matters
Leak complaints almost always trace back to one of three things: an over-torqued centre post, a seal that sat in a hot container, or a fill volume pushed past the design limit. We cap fill volume slightly below maximum for exactly that reason.
7 separate checks run before a carton is sealed: electrical, mechanical, leak, finish and packaging. Anything outside tolerance is quarantined the same day and reported to you, rather than shipped with a hope and a discount.
Specification summary
| Battery | 500 mAh |
| Pod capacity | 3.0 ml |
| Coil resistance | 1.2 ohm |
| Included | Device, 2 pods, cable |
| Charging | USB-C 5V/1A |
| Packaging | Retail box |
| Minimum order | 300 units per SKU, mixed cartons allowed |
| Lead time | 30 working days after artwork approval |
None of this is complicated. It is just written down, which is more than most buyers get before they wire a deposit.
Frequently asked
Do you support private label?
We do. Send your artwork or your brand direction and we will return a digital proof, then a physical dummy for colour approval. Packaging files stay on record so a rebrand later is a file update rather than a redesign.
How long does production take?
Around 22 working days after artwork approval for stock configurations, plus transit. Custom runs add roughly a week for tooling and a physical dummy. We confirm the date in writing on the order acknowledgement.
How do you handle repeat orders?
The specification is held on file against your account, so a reorder is a reference rather than a new brief. We recommend a standing schedule with a fixed weekly cut-off so stock lands before the shelf empties.
Related reading
Need a quotation on starter vape kits?
Send destination market, target price and quantity. Same-day reply on working days.
Tel / WeChat / WhatsApp +86 13711127975 · vape@0099933.xyz